Skip to content

Industries

One record for line and office.

A plant already runs on written process and on numbers per shift, and those belong on the same records as the goals above them.

Manufacturing

Where the shift record stops.

  1. Standard operating procedure lives in a binder and a shared drive, at two different versions.
  2. Shift numbers are written down, then retyped, then argued about at the weekly meeting.
  3. Supervisors own results nobody wrote down, so handover loses half of it.
  4. Improvement goals are a slide, and no one can point at the work that moved them.

What you get

What you would use.

  • Versioned procedureFour kinds of process doc, published with a version, with the old one readable for the period it governed.
  • Sign off that is recordedWho acknowledged the current version, per person and per line, exportable.
  • Measures per shiftA target, a direction and an owner for the reading, kept per period so the trend is the record.
  • Roles, not namesA role definition carries its result areas and what it escalates, which is what a handover actually needs.
  • Tables for the restA real spreadsheet with formulas, lookups and rollups, for the working a product surface should not try to own.
  • Improvement goalsGoals that roll up with a computed verdict, and an effort panel listing the linked work.

What teams here measure.

  • Output per shift
  • Rework rate
  • Downtime
  • Acknowledgement rate
  • Goal progress

Questions

Straight answers.

Does it connect to our plant or finance systems?

No. There is a v1 REST API and CSV import and export. No connector to a third party product ships.

Is there a native mobile app?

No. The site is responsive and works on a phone browser. There is no app in a store.

Can we keep our standard's documentation here?

You can keep the documents, the versions and the acknowledgement record. We hold no certification ourselves and make no claim about yours.

Open it on your own work.